Hotel Lobby - Primus Hotel Sydney

Hotel Lobby

On 23 December 2015 one of Sydneys finest examples of art deco glamour opened its doors as the 5 star Primus Hotel Sydney. Perfectly positioned in the heart of the city, this heritage sensitive refit of the former Sydney Water Board headquarters has breathed new life into an iconic 1930s building. The hotel showcases a lobby bar, an adjoining restaurant, The Wilmot, a rooftop pool, and conferencing and event spaces underpinned by a modern design philosophy. The generously sized 159 rooms and 13 suites feature lavish contemporary interiors that create an authentic and engaging experience for both leisure and corporate guests.

Facilities:

  • Bar on Premises
  • Gymnasium
  • Hotel
  • Pool

Reception Hours:

24 hours

Check In:

3.00pm

Check Out:

11.00am

Check In/Out Info:

Internet Facilities:

Number Of Rooms:

172

Number Of Floors:

6

Distance To Nearest Airport:

12km

Distance To Nearest Beach:

6km

Distance To Nearest Public Transport:

500m

Restaurant Info:

The Wilmot Restaurant (contemporary Australian cuisine)

Bar Info:

The Lobby Bar

Credit Cards Accepted:

Note that a credit card may be requested upon check-in as a form of security deposit.

Disabled Facilities:

Ramp at entrance and specially adapted Deluxe Rooms with adaptive bathrooms and open-plan bathroom design.

Transfer Info:

Please select from our transfer options.

Important Information:

Limited onsite parking (heritage building) and under cover parking available closeby. Bus and taxi pick up/drop off loading zone in front of hotel. Ongoing real estate development to the north of the hotel (redevelopment of an office block). Some sporadic day time noise disturbance may be experienced. Estimated completion, end of 2018. All rooms/suites facing this development zone are on a last sell basis. An additional development site for Sydney's high speed rail network is anticipated to commence in mid 2017 and is located opposite the hotel entrance on Pitt Street. The work is the development of a new metro station with the majority of work underground. Some sporadic daytime noise disturbance may be experienced. Estimated completion of this transport project is 2022.

 
Loading map, please wait...

Dates and Passenger details

Specify child ages as at time of travel

Retrieving information....